National Clean Energy Asset Registry · Decision 500/QĐ-TTg · Decision 262/QĐ-TTg

Vietnam PDP8 Clean Energy Registry & Statutory Asset Pipeline

960 utility facilities · Decision 500/QĐ-TTg statutory targets.

Clean Baseload
80,612 MW

53.6% of PDP8 Mandate Active

2030 Target Mandate
150,489 MW

Decision 500/QĐ-TTg Horizon

Pipeline Delta Gap
+69,877 MW

Mandated 2026-2030 COD

Tracked Facilities
960 Assets

Geocoded across 63 Provinces

Transmission Grid
65,566 km

1,915 Substations (500/220kV)

Statutory Capex
$134.7B

$119.8B Gen + $14.9B Grid

Decree 80 DPPA
2,000+ MW

Private Wire & Grid Wheeling

Wind & Solar Quota
48,478 MW

27.9 GW Wind + 20.6 GW Solar

Decision 500/QĐ-TTg · 500kV Supergrid Backbone · Inter-Regional Wheeling Flow

National Electrical Transmission Spine & Clean Energy Power Flow

North-South 500kV wheeling · 65,566 km circuits · 1,915 substations.

500kV Flow: 15,888 km (180 Circuits)
220kV Grid: 27,007 km (780 Circuits)
EV Atlas: 22,055 Plugs ↗
EV Map (22k) ↗
Transmission Corridor Flow
500kV North-South Spine
220kV Intertie Regional Corridors
Operational Generation Plants (960)
Model: NSMO Vietnam 2025 65,566 km Circuits

Node Telemetry Dossier

National Overview

Provincial Capacity Intelligence & Asset Lifecycle Analytics

960+ utility assets · Multi-fuel analytics · Click to cross-filter.

Top 10 Energy Provinces (MW Capacity) Operational & Pipeline
Fuel:
Facility Name Developer / Sponsor Type Capacity Province Action
Showing 1 to 25 of 960 assets
1 / 39
DECISION 500/QĐ-TTg · RESOLUTION 55-NQ/TW · NET-ZERO 2050 PATHWAY

The 14 Strategic Pillars of Vietnam's National Energy Transition

Statutory capacity targets, capex allocation, and execution milestones through 2030.

Pillar 01 · Generation $18.5B Est. Capex

Offshore Wind Supergrid

Target 2030: 6,000 MW
2050 Vision: 70,000 - 91,500 MW
Statutory: Decision 500/QĐ-TTg, Marine Spatial Plan
Pillar 02 · Generation $26.2B Est. Capex

Onshore & Nearshore Wind Corridors

Target 2030: 21,880 MW
Current COD: 4,798 MW (21.9%)
Statutory: Decision 500/QĐ-TTg Table 1
Pillar 03 · Generation $14.1B Est. Capex

Utility & Rooftop Solar PV

Target 2030: 12,836 MW + RTS
Operating Capacity: 16,500+ MW
Statutory: Decree 135/2024/NĐ-CP (Self-Consumption)
Pillar 04 · Generation $11.8B Est. Capex

Flexible Hydro, Pumped Storage & BESS

Hydro Baseload: 29,346 MW
Pumped + BESS: 2,700 MW by 2030
Statutory: Decision 500/QĐ-TTg, Pumped Storage Roadmap
Pillar 05 · Generation $31.4B Est. Capex

Domestic Gas & Transition LNG Terminals

Domestic Gas Target: 14,930 MW
Import LNG Target: 22,400 MW
Statutory: National LNG Terminal Master Plan
Pillar 06 · Generation $3.6B Est. Capex

Biomass, Waste-to-Energy & Cogen

Target 2030: 2,270 MW
2050 Potential: 6,015 MW
Statutory: Circular Economy & Waste Management Directives
Pillar 07 · Supergrid $14.9B Est. Capex

500kV Supergrid Backbone Spine

Circuit Extent: 15,888 km (180 Circuits)
Wheeling Capacity: Up to 5,000 MW Northward
Statutory: National Key Infrastructure Project (Circuit-3 COD 2024)
Pillar 08 · Supergrid $4.2B Est. Capex

Cross-Border ASEAN Grid Interties

Lao Import Quota: 5,000 - 8,000 MW
Subsea Export Vision: 1,200 MW to Singapore
Statutory: Vietnam-Laos Energy Cooperation Agreement
Pillar 09 · Supergrid $3.8B Est. Capex

Smart Grid Automation & Digital SCADA

Digital Substations: 100% Unmanned by 2030
DSM Flexibility: 2,000 MW Shaving
Statutory: Prime Minister Decision 1670/QĐ-TTg (Smart Grid)
Pillar 10 · Market Reform Private Wheeling

Direct Power Purchase Agreement (DPPA)

Mechanisms: Direct Wire & Grid-Connected
Eligibility: ≥ 200,000 kWh/month
Statutory: Decree 80/2024/NĐ-CP (Enacted July 3, 2024)
Pillar 11 · Market Reform Spot Clearing

Competitive Power Market (VWEM / VREM)

Market Design: SMP + Capacity (CAN)
Retail Choice (VREM): Target Full Rollout 2026+
Statutory: Amended Electricity Law 2024, ERAV Circulars
Pillar 12 · Net-Zero Tech $6.2B Est. Capex

Green Hydrogen, Ammonia & Power-to-X

Target 2030: 100k - 500k tons/year
2050 Scale: 10 - 20 Million tons/yr
Statutory: Decision 165/QĐ-TTg (Hydrogen Strategy)
Pillar 13 · Carbon Market $4.5B Carbon Value

National Carbon Market & Article 6 ETS

ETS Launch: Pilot 2025 · Full 2028
Covered Emitters: 1,912 Industrial Sites
Statutory: Decree 06/2022/NĐ-CP · Decision 13/2024/QĐ-TTg
Pillar 14 · Grid Baseload $8.0B Basal Capex

Industrial DSM & Nuclear SMR Readiness

DSM Peak Shaving: 1,500 MW Target
SMR Exploration: Post-2035 Horizon
Statutory: Decision 280/QĐ-TTg · Resolution 55-NQ/TW
Decision 500/QĐ-TTg · Decision 262/QĐ-TTg · PDP8 Statutory Transition Matrix

Statutory Power Generation Sector Mix & 2030 Transition Targets

PDP8 targets vs operational capacity · Click row to filter GIS.

2030 Mandate: 150,489 MW
Operating: 80,612 MW (53.6%)
Generation Sector / Fuel Operating (MW) 2030 Mandate (MW) Pipeline Delta (MW) Transition Progress (Active / Target) 2030 Share Statutory Policy Status & Scope GIS Action
Hydropower Thủy điện
19,101 MW 29,346 MW +10,245 MW
65% active +35% pipeline
19.5% Expansion of major dams (Ialy, Tri An, Hoa Binh) + small hydro run-of-river
Onshore Wind Điện gió trên bờ & gần bờ
4,603 MW 21,880 MW +17,277 MW
21% active +79% pipeline
14.5% Heavy deployment in Central Highlands, South Central Coast & Mekong Delta
Offshore Wind Điện gió ngoài khơi
0 MW 6,000 MW +6,000 MW
0% active +100% pipeline
4.0% Pioneering pilot concessions (Thang Long, La Gan, Ca Mau) awaiting marine spatial licenses
Solar Power Điện mặt trời (Tập trung & Mái nhà)
11,467 MW 15,436 MW +3,969 MW
74% active +26% pipeline
10.3% 12,836 MW utility-scale + 2,600 MW self-consumption under Decree 135/2024/ND-CP
Biomass & Waste Sinh khối & Điện rác
620 MW 2,270 MW +1,650 MW
27% active +73% pipeline
1.5% Wood pellets, bagasse, and municipal solid waste-to-energy facilities
Domestic Gas & LNG Nhiệt điện Khí & LNG
7,200 MW 37,330 MW +30,130 MW
19% active +81% pipeline
24.8% 14,930 MW domestic gas (Block B, Ca Voi Xanh) + 22,400 MW imported LNG fleet
Grid Storage & Pumped Hydro Thủy điện tích năng & Pin lưu trữ (BESS)
0 MW 2,700 MW +2,700 MW
0% active +100% pipeline
1.8% Bac Ai 1,200 MW pumped storage + pilot utility BESS frequency regulation systems
Coal Thermal (Capped) Nhiệt điện than (Đạt đỉnh & Khống chế)
26,000 MW 30,127 MW +4,127 MW
86% active +14% pipeline
20.0% Strict cap under JETP; no new coal-fired plants approved after 2030
Power Imports Nhập khẩu điện
1,621 MW 5,400 MW +3,779 MW
30% active +70% pipeline
3.6% Cross-border transmission lines from southern Laos and China
National System Totals 80,612 MW 150,489 MW +69,877 MW
54% System Active +46% System Pipe
100.0% Decision 500/QĐ-TTg & Decision 262/QĐ-TTg National Power Master Plan Mandate
DYNAMIC ENERGY BALANCE MODEL · PRIMARY GENERATION TO INDUSTRIAL SINK

National Energy Transition Flow & Power Balance Trajectory

Phased decarbonization power flow · 500kV supergrid · Sectoral sinks.

Annual Generation
280.5 TWh
+8.2% YoY growth
Peak Demand (Pmax)
48,500 MW
National High: May 2024
Renewable Share
43.2%
Hydro 29% + Solar/Wind 14%
Grid Carbon Intensity
0.68 tCO2/MWh
Target ≤ 0.42 by 2030
Stage 1 · Primary Generation 84,000 MW Installed
Hydropower (Run-of-River & Reservoir) 23,500 MW (28.0%)
Coal Thermal (Phasing Down) 26,800 MW (31.9%)
Domestic Gas & Transition LNG 7,200 MW (8.6%)
Solar PV (Utility + Rooftop RTS) 16,500 MW (19.6%)
Wind Corridors (Onshore/Offshore) 4,800 MW (5.7%)
Storage BESS, Imports & Biomass 5,200 MW (6.2%)
Stage 2 · Supergrid & Wheeling 65,566 km Circuits
500kV Supergrid Spine Wheeling: ~3,200 MW Peak (Central → North)

Transmitting renewable energy from Southern/Central surplus regions to industrial manufacturing clusters in Northern Vietnam.

220kV Regional Interties: 27,007 km (780 Circuits)

Regional inter-provincial pooling substations collecting utility solar, wind, and cascade hydropower.

Transmission Losses & Reserve: 6.25% Grid Loss

Technical loss optimized down from 7.5% through Circuit-3 500kV operation and automated VAR compensation.

Direct Wheeling Protocol: High-voltage substations dynamically route green energy under Decree 80/2024 DPPA to subscribed industrial off-takers.
Stage 3 · Sectoral Demand Sinks 100% Demand
Industrial Parks & Clean Manufacturing 54.2% (~152 TWh)
High-tech semiconductors, steel, electronics & RE100 manufacturing
Residential & Commercial Buildings 35.8% (~100 TWh)
Urban municipal loads, HVAC cooling, urban lighting & commercial towers
Electric Mobility & EV Charging Corridors 6.5% (~18 TWh)
Fast-growing EV fleet (VinFast & public transport) across 22,055+ charging ports
Green Hydrogen, Ammonia & Export 3.5% (~10 TWh)
Power-to-Gas electrolysis, green steel, and maritime shipping fuels
NATIONAL DISPATCH AUTHORITY · VWEM WHOLESALE CLEARING · DECREE 80 DPPA

National Energy Situation & Wholesale Market Intelligence Terminal

VWEM spot clearing, reserve margins · Decree 80 DPPA tariff schedules.

VWEM Spot Market: Active
System Balance & Operational Reserve Dispatch Cycle: Real-Time
National Peak Demand vs Capacity 57.7% System Loading
Current Peak Load:
48,500 MW
Total Installed Capacity:
84,000 MW
Regional Grid Reserve Margins
Northern Grid
12.4% Reserve
Summer Peak Dependent
Central Grid
46.8% Reserve
Clean Energy Surplus
Southern Grid
28.5% Reserve
Industrial Baseload
500kV Northward Wheeling
3,200 MW Continuous
Central/South → North
Cascade Hydro Storage
78.5% Reservoir Cap
Sơn La & Hòa Bình Dam
System Security Note: National Load Dispatch Centre (NLDC / NSMO) coordinates dynamic AGC and secondary reserves across all 500kV interties to ensure grid frequency stability at 50.0 ± 0.2 Hz.
Wholesale Market Clearing & Tariff Structure VWEM Spot Reference
System Marginal (SMP)
1,640 VND
$0.066 / kWh
Capacity Payment (CAN)
185 VND
$0.0075 / kWh
Full Market (FMP)
1,825 VND
$0.073 / kWh
Decree 80/2024/NĐ-CP DPPA Wheeling Fee Total: ~280.0 VND/kWh ($0.011)
Transmission Fee: 79.5 VND/kWh
Distribution Fee: 165.2 VND/kWh
Dispatch Ancillary: 35.3 VND/kWh
Industrial Retail Electricity TOU Tiers (MoIT) Decision 2699/QĐ-BCT
Off-Peak (22:00-04:00) 1,100 VND $0.044/kWh
Normal Hours 1,685 VND $0.068/kWh
Peak (09:30-11:30, 17-20) 3,171 VND $0.128/kWh
Investment Brief: Under Decree 80 DPPA, clean generators sell at spot VWEM prices while contracting virtual Contracts-for-Difference (CfD) with corporate buyers, de-risking capital investments.
National Electric Mobility Telemetry Suite · 6 Master Visuals

CPO Operator Dominance, Charging Velocity Tiers & Grid Interties

22,055 Outlets · 63 Provinces · Click to cross-filter.

22,055 Outlets Analyzed
CPO Market Structure Takeaway: VinFast accounts for 95.7% of operational plugs; independent CPOs (EV ONE, Charge+, EBOOST) focus on high-traffic commercial hubs.
VinFast 21,105 · Public 950
CPO Operator Share Click → Filter
Visual 02 · Charging Speed Tiers Click → Filter
Geographic Siting Intelligence: Hanoi and HCMC represent 46% of urban destination chargers, while expressways anchor 750+ ultra-fast DC plugs (180-250 kW).
Hanoi & HCMC Top Hubs
Visual 03 · Top 10 EV Provinces Click → Filter
Visual 04 · Power Velocity Curve kW Frequency
Grid Interconnection Synthesis: 14,200 ports connect directly to 110kV municipal distribution lines, while 250kW supercharging hubs require dedicated 220kV intertie substation spurs.
110kV / 220kV Grid Aligned
Visual 05 · Connector Standards CCS2 vs Type 2
Visual 06 · Grid Substation Intertie Headroom Alignment
National Sovereign Cartography Official Territorial Extent

Vietnam Sovereign Energy Geography & Maritime Archipelagos

National spatial reference of the Socialist Republic of Vietnam encompassing mainland provinces, continental shelf Exclusive Economic Zone (EEZ), and sovereign archipelagos: Quần Đảo Hoàng Sa and Quần Đảo Trường Sa.

Continental Shelf & EEZ 600+ GW Offshore Wind Potential
500kV Transmission Spine Circuits 1, 2, 3 North-South Backbone
Sovereign Archipelagos Hoàng Sa · Trường Sa Territorial Waters
Official Map of Vietnam with Hoang Sa and Truong Sa Archipelagos