Vietnam PDP8 Clean Energy Registry & Statutory Asset Pipeline
National clean energy telemetry tracking 960 utility facilities against Decision 500/QĐ-TTg statutory mandates.
53.6% of PDP8 Mandate Active
Decision 500/QĐ-TTg Horizon
Mandated 2026-2030 COD
Geocoded across 63 Provinces
1,915 Substations (500/220kV)
$119.8B Gen + $14.9B Grid
Private Wire & Grid Wheeling
27.9 GW Wind + 20.6 GW Solar
The 14 Strategic Pillars of Vietnam's National Energy Transition
Statutory capacity targets, capex allocation, and execution milestones through 2030.
Offshore Wind Supergrid
Onshore & Nearshore Wind Corridors
Utility & Rooftop Solar PV
Flexible Hydro, Pumped Storage & BESS
Domestic Gas & Transition LNG Terminals
Biomass, Waste-to-Energy & Cogen
500kV Supergrid Backbone Spine
Cross-Border ASEAN Grid Interties
Smart Grid Automation & Digital SCADA
Direct Power Purchase Agreement (DPPA)
Competitive Power Market (VWEM / VREM)
Green Hydrogen, Ammonia & Power-to-X
National Carbon Market & Article 6 ETS
Industrial DSM & Nuclear SMR Readiness
Statutory Power Generation Sector Mix & 2030 Transition Targets
Authoritative statutory fuel transition breakdown comparing Vietnam's active operational baseload against required pipeline capacity through 2030. Click any sector row or GIS action to filter corresponding spatial assets and dossier records in the cockpit below.
| Generation Sector / Fuel | Operating (MW) | 2030 Mandate (MW) | Pipeline Delta (MW) | Transition Progress (Active / Target) | 2030 Share | Statutory Policy Status & Scope | GIS Action |
|---|---|---|---|---|---|---|---|
|
Hydropower
Thủy điện
|
19,101 MW | 29,346 MW | +10,245 MW |
65% active
+35% pipeline
|
19.5% | Expansion of major dams (Ialy, Tri An, Hoa Binh) + small hydro run-of-river | |
|
Onshore Wind
Điện gió trên bờ & gần bờ
|
4,603 MW | 21,880 MW | +17,277 MW |
21% active
+79% pipeline
|
14.5% | Heavy deployment in Central Highlands, South Central Coast & Mekong Delta | |
|
Offshore Wind
Điện gió ngoài khơi
|
0 MW | 6,000 MW | +6,000 MW |
0% active
+100% pipeline
|
4.0% | Pioneering pilot concessions (Thang Long, La Gan, Ca Mau) awaiting marine spatial licenses | |
|
Solar Power
Điện mặt trời (Tập trung & Mái nhà)
|
11,467 MW | 15,436 MW | +3,969 MW |
74% active
+26% pipeline
|
10.3% | 12,836 MW utility-scale + 2,600 MW self-consumption under Decree 135/2024/ND-CP | |
|
Biomass & Waste
Sinh khối & Điện rác
|
620 MW | 2,270 MW | +1,650 MW |
27% active
+73% pipeline
|
1.5% | Wood pellets, bagasse, and municipal solid waste-to-energy facilities | |
|
Domestic Gas & LNG
Nhiệt điện Khí & LNG
|
7,200 MW | 37,330 MW | +30,130 MW |
19% active
+81% pipeline
|
24.8% | 14,930 MW domestic gas (Block B, Ca Voi Xanh) + 22,400 MW imported LNG fleet | |
|
Grid Storage & Pumped Hydro
Thủy điện tích năng & Pin lưu trữ (BESS)
|
0 MW | 2,700 MW | +2,700 MW |
0% active
+100% pipeline
|
1.8% | Bac Ai 1,200 MW pumped storage + pilot utility BESS frequency regulation systems | |
|
Coal Thermal (Capped)
Nhiệt điện than (Đạt đỉnh & Khống chế)
|
26,000 MW | 30,127 MW | +4,127 MW |
86% active
+14% pipeline
|
20.0% | Strict cap under JETP; no new coal-fired plants approved after 2030 | |
|
Power Imports
Nhập khẩu điện
|
1,621 MW | 5,400 MW | +3,779 MW |
30% active
+70% pipeline
|
3.6% | Cross-border transmission lines from southern Laos and China | |
| National System Totals | 80,612 MW | 150,489 MW | +69,877 MW |
54% System Active
+46% System Pipe
|
100.0% | Decision 500/QĐ-TTg & Decision 262/QĐ-TTg National Power Master Plan Mandate |
Provincial Capacity Intelligence & Asset Lifecycle Analytics
Interactive multi-fuel generation analytics across 960+ assets. Click any province bar or status slice to filter the table below.
National Electrical Transmission Spine & Clean Energy Power Flow
Live geospatial topology visualizing North-South power wheeling corridors between Central/Southern renewable hubs and Northern load centers across 65,566 km of AC circuits and 1,915 substations.
Node Telemetry Dossier
National Energy Transition Flow & Power Balance Trajectory
Simulated end-to-end power flow tracing primary energy supply transformation, transmission wheeling through the 500kV/220kV supergrid, and sectoral consumption sinks across Vietnam's phased decarbonization roadmap.
Transmitting renewable energy from Southern/Central surplus regions to industrial manufacturing clusters in Northern Vietnam.
Regional inter-provincial pooling substations collecting utility solar, wind, and cascade hydropower.
Technical loss optimized down from 7.5% through Circuit-3 500kV operation and automated VAR compensation.
National Energy Situation & Wholesale Market Intelligence Terminal
Real-time national dispatch balance telemetry, regional grid reserve margins, Vietnam Wholesale Electricity Market (VWEM) spot clearing rates, and Decree 80/2024 DPPA tariff schedules.